
Electrical installation on cruise ships Cruise. Large crews, fast.
Cable trays, cable pulling, connection and commissioning on cruise ships. With crews as large as the ship demands.
A cruise ship has thousands of cables, and all of them must be in place by the deadline. What counts is how fast a crew gets on board. And that it works as cleanly on deck ten as on deck one.
What we do there.
One crew for cable trays, cable pulling, connection and testing.
Cable trays across all decks
Installing trays and brackets, long-distance and local cable pulling from deck to deck.

Cabins and hotel areas
Cable pulling and connection in cabins, corridors, restaurants and theatres.
Switchgear and distribution boards
Connection to the main switchboard and sub-distribution boards, testing and test reports.
Network and special cables
Fibre optic cables with OTDR, coax and CAT7. Connected and tested in-house.
Welding on board
Brackets for cable trays, penetrations and earthing studs. Welders qualified to EN ISO 9606-1.
Staff for peak loads
Additional electricians as a work package or through temporary staffing. With an AÜG licence.
Large crews, fast.
Cable pulling and connection across many decks, at the shipyard's pace. 250+ skilled workers, led by our site managers on board.
Electrical work on a cruise ship.
Quick answers.
What shipyards and shipowners ask us most often.
01How many skilled workers do you provide for a cruise ship newbuild?
We have 250+ skilled workers, with our own employees at the core. How many of them go on board depends on your scope. Tell us what is coming up and we will plan the team.
02Do you take on complete cable pulling packages under a work contract?
Yes. We deliver a clearly defined scope as a work package, with our own crew and our own site managers. If your team only needs reinforcement, we provide electricians through temporary staffing.
03Who leads the people on board?
Our site managers. They are your point of contact on site and coordinate the work with the shipyard. For technical questions we have over 30 engineers.
04How do you document testing and acceptance?
Every cable is labelled. Every measurement, including the fibre optic test with OTDR, goes into a test report. Commissioning and acceptance are carried out together with the shipyard or shipowner.
Credentials · at a glance
We will send you certificates and supporting documents on request.
- 250+skilled workers
- 20+site managers on board
- 30+engineers
- ISO 9001and ISO 14001
Here too, we are on board.
Project on board? Get in touch.
Electronautics GmbH · Seelandstraße 1 · 23569 Lübeck